Our Installation Process

From initial consultation to final inspection, we follow a proven process to ensure your floor coating project exceeds expectations. Quality, professionalism, and attention to detail at every step.

1

STEP ONE

Free Consultation & Assessment

Every project begins with a thorough consultation. We'll visit your location to assess the concrete condition, discuss your goals, and answer all your questions about the coating process.

Site Inspection

We evaluate your concrete surfaces for moisture, damage, and suitability for coating

Product Recommendations

We recommend the best coating system based on your needs and budget

Detailed Quote

You'll receive a transparent, itemized quote with no hidden fees

Consultation Details

Duration
1-2 Hours
Cost
100% Free
You Receive
Written Quote
Obligation
None
A retail of a concrete Grinding machine on construction site
2

STEP TWO

Professional Surface Preparation

Proper surface preparation is the foundation of a successful floor coating. We use professional diamond grinding equipment to mechanically prepare your concrete - no acid etching.

Diamond Grinding

Commercial-grade grinders remove contaminants and create proper surface profile

Crack & Spall Repair

We fill cracks and repair damaged areas with appropriate repair materials

Thorough Cleaning

Industrial vacuums remove all dust and debris for optimal coating adhesion

This step typically takes 4-8 hours depending on the size and condition of your floor.

3

STEP THREE

Primer Application

A high-quality primer coat creates a strong bond between your concrete and the coating system. This critical layer seals the concrete and provides the foundation for a long-lasting finish.

Moisture Barrier

Seals concrete pores to prevent moisture vapor transmission

Enhanced Adhesion

Creates optimal bonding surface for subsequent coating layers

Professional Application

Applied with rollers and brushes to ensure complete coverage

Worker applying epoxy coating on the industrial floor with a roller, reflecting surface, in a modern warehouse setting.
Epoxy full flake broadcast system for business
4

STEP FOUR

Base Coat & Decorative Elements

The base coat provides color and additional protection. If you've chosen decorative flakes or other enhancements, they're broadcast into the wet coating for a custom look.

Color Application

Your chosen color is applied in the appropriate thickness

Flake Broadcast (Optional)

Decorative flakes add texture, slip resistance, and visual appeal

Even Coverage

Professional techniques ensure uniform thickness throughout

5

STEP FIVE

Clear Topcoat & Final Inspection

The final protective topcoat provides durability, UV resistance, and that beautiful glossy finish. After curing, we conduct a thorough inspection and walkthrough with you.

High-Performance Topcoat

Crystal-clear, UV-resistant finish for maximum protection and shine

Quality Inspection

We check for any imperfections and ensure complete satisfaction

Care Instructions

Detailed guidance for curing period and long-term maintenance

Your Floor is Ready!

Foot Traffic: 24 hours

Vehicle Traffic: 3-5 days (epoxy) or 24-48 hours (polyaspartic)

Full Cure: 7 days

Epoxy floor coating for garage and pole barn

What to Expect

Understanding the timeline and what happens during your project

Typical Timeline

2-3 Days

For most residential garage projects

Crew Size

2-3 People

Professional, trained technicians

Clean Workspace

Daily Cleanup

We keep your property tidy

Before We Start

Your Preparation Checklist

  • Clear all items from the area
  • Remove vehicles from garage
  • Ensure access to water and electricity
  • Provide parking space for crew vehicles

We Handle Everything Else

  • All equipment and materials
  • Surface preparation
  • Professional application
  • Complete cleanup

Ready to Start Your Project?

Schedule your free consultation today. We'll walk you through every step and answer all your questions about the floor coating process.